We will be having another Range Work Day on July 7th. All help is greatly appreciated. Things are really progressing well at the Range. The 600 m is just about finished. The 200 m will be done probably next week, if the weather holds. The golf cart shed is coming along, as the volunteers get time.
We came up with this list of improvements:
—-put up downed traffic signs on roadway
—-green Range flags need to be replaced with durable materials.
—-50 m range shed needs to be pressure washed as well as toilet interior
—-the shed posts and the toilets need to be painted. There is white tremclad in the TRC for the posts. Toilet interior paint will need to be purchased at Home Hdw and brushes can be picked up at the dollar store.
—- there needs to be a couple more ceasefire signs ordered by Derrick.
—-each range needs at least one good quality broom and dustpan. Anyone know a cleaning supply company that would donate this?
—-the steps on the gravel slope of the 600 m need to relocated to the east entrance
—-Jake Bergen needs to install the handicap ramp on the south entrance of the 600 m
—-the MD needs to put down asphalt on the lane from the parking lot to the 100 m as well as the cart paths down each side of 600 m
—-an entrance gate, similar to the one on the 50 m Range needs to be built at the entrance to the 200 m in order to restrict vehicle access
—-the weeds etc at the main gate entrance need mowing
—-more target stands (both fixed and portable)need to constructed for the 50/200&600m Ranges. There is lots of lumber out there to use.
—-the target backstops on the 100 m need lots of repair.
—-gun racks are needed in each shelter
—-seating benches are needed in the 600 and 200 m shelters just like the ones in the 50 or 100 m. Brackets, bench frames and cover boards are in the TRC and 100 m shelter.
—-all the scrap lumber around the TRC and piled by the Skeet houses needs to be hauled to the dump. Cory Armfelt needs to be contacted to arrange permission to haul to the landfill.
—-Target boards for the portable targets should be precut and and placed on each range for shooters to install when needed. Full sized sheets should be placed under each shelter for the same reason
—-the golf carts need to be serviced. I believe we have a few mechanics that might help get them operable. If you know who, invite them to work on the carts
—-the approach off the highway and near the fob reader needs some gravel spread